Activities
-
Industrial warehouse
Warehouse builded in city of Fieri.
Time of realization:
07/05/2011 - 17/05/2011
Concrete firm silo
Produced for an enterprise of cement in Elbasan.
Time of realization:
20/01/2010-27/07/2010
Industrial electronic scales
Constructed in the mine of Kalimash in Kukes.
Time of realization:
25/09/2011-10/10/2011 -
Hydro ports
Gates produced for an electricl power station, Dardha in Puka.
Time of realization:
08/02/2012-15/02/2012
Personalized benches
Benches, our idea and realization. With "Kurum International" logo on it, the client was very satisfied.
Time of realization:
03/09/2012-08/09/2012
special Industrial electronic scales
Produced for bucket of fusion, in the metallurgy of Elbasan.
Time of realization:
09/04/2011-16/04/2011 -
Cleaner for HPP
Produced for an electricl power station, Dardha in Puka.
Time of realization:
16/04/2012-22/04/2012
Industrial electronic scales
Weighbridge 14m, for an enterprise in Durres.
Time of realization:
04/07/2011-12/07/2012
Industrial electronic scales
Weighbridge 16m, for an enterprise of scrap in Saranda.
Time of realization:
16/11/2011-23/11/2011